PERIL OF LANDSLIDE CLAUSE (4.10)

P-Clauses358 Views
banner 468x60

In consideration of the payment of an additional premium as arranged, this policy shall also cover the peril of subsidence, landslip or landslide except:

  1. The first Rp. 10,000,000.00 or 5% of the Sum Insured, which ever the less, of any one occurrence up to a maximum period of 72 consecutive hours from the start of subsidence, landslip or landslide.
  2. Subsidence, landslip or landslide caused by:
    1. Faulty construction of the building or structures
    2. Faulty design of the building or structure
  • Soil damage due to human action
  1. Nuclear reaction

banner 336x280

Leave a Reply

Your email address will not be published. Required fields are marked *