FAILURE OF PUBLIC UTILITIES CLAUSE

banner 468x60

FAILURE OF PUBLIC UTILITIES CLAUSE (Version 1)

Loss as Insured by this Policy resulting from interruption of or interference with the business in consequence of damage (as within defined) to property  at an electricity station or sub-station from which the Insured obtain electric current shall be deemed to be loss resulting from damage to property used by the Insured at the premises provided that the Company shall not be liable for any loss Insured by this extension unless the failure of electric current from such electricity station or sub-station exceed a period 72 hours and the liability of the Company under this extension shall apply only to such period in excess of 72 hours.

banner 336x280

FAILURE OF PUBLIC UTILITIES CLAUSE (Version 2)

It is hereby agreed and declared that this Insurance shall, subject to the conditions of this policy and to all provisions and limitations contained therein, extend to include loss as described therein resulting from Interruption of the supply of electric power (or gas) to the premises of the Insured due to damage by Fire or Lightning or Explosion or Impact of aircraft occurring at any electric power station or substation (or gas works) in Indonesia, but excluding any transmission lines.

banner 336x280

Leave a Reply

Your email address will not be published. Required fields are marked *